Canoe Lake Sports Pavilion - Progress on site

Work is progressing well on site in Southsea. The groundworks and ground floor blockwork is complete with the first floor cast in situ concrete slab now poured. The Ground floor steelwork is finished, fabricated beautifully by Blue Cube Fabrications Ltd - the first floor steel will be arriving in the next few weeks.

The facing Petersen Kolumba (http://en.petersen-gruppen.dk) brickwork will be erected during September. These bricks were developed with Peter Zumthor for the Kolumba Museum in Cologne and are produced in a longer slimmer format than the traditional brick sizes seen commonly in the UK.

The world class grass tennis courts are now open for public use and Canoe Lake Leisure Tennis Club membership numbers are booming (http://www.canoelakeleisure.co.uk). The first competitions on the new courts are scheduled for next year with ranked players from around the world competing in Pre Wimbledon Qualifiers. The project manager for the Pavilion is Rice Projects (http://www.riceprojects.co.uk) and the project is due for completion in spring 2017.

IMG 6208

STEELWORK

1471795778011

FOUNDATIONS

IMG 6206

STEELWORK

Screen Shot 2016 08 25 at 19.03.27

VIEW FROM COURTS

Screen Shot 2016 09 19 at 10.51.50

Standing on first floor slab

Screen Shot 2016 09 19 at 10.52.10

View of hard courts from first floor slab

Screen Shot 2016 09 19 at 10.52.52

Concrete soffit